(865) 272-3213

Corporate Information

NAICS Codes

541330 Engineering
541490 Design
541511 Custom Computer/Programming Services
541611 Management
541618 Consulting
541620 Environmental
541690 Nuclear Energy
541712 Development
541990 Scientific & Technical
561110 Executive Services
561210 Facilities Support
561621 Security
562211 Hazardous Waste Treatment and Disposal
562910 Remediation Services
562998 Waste Management

Project Management & Implementation

Project Management

  • Construction and Environmental Management Projects (DOE O 413.3A)
  • Scheduling and Critical Path Identification
  • Project Prioritization and Budgeting
  • Resource Planning and Loading
  • Project Management Professional (PMP)

Regulatory Compliance

  • Facility Startup Support
  • Hazardous Waste Management
  • OSHA Program Safety Management
  • Industrial Hygiene Support
  • Job Hazard Analysis
  • NQA-1 Program
Nuclear Operations and Nuclear Safety

Nuclear Facility Operations

  • Work Management & Controls
  • Conduct of Operations Implementation and Validation
  • Operations & Management Support
  • Nuclear Technical Procedure Development & Implementation
  • Integrated Safety Management Implementation
  • Reliability, Availability, Maintainability, Inspectability (RAMI)
  • Industrial safety and health
  • Waste management, packaging, and transportation compliance

Training Development & Instruction

  • Systems Operations Training
  • Performance Based Training
  • Training Material Development and Implementation

Nuclear Safety

  • Nuclear safety analysis for Hazard Category 2 and 3 nuclear facilities
  • Hazards identification, screening, and evaluation
  • Chemical and radiological dispersion and consequence analyses
  • Hazard control development and implementation
  • DSA/TSR development and revision per DOE-STD-3009-2014
  • Safety Basis Assessment and Implementation

Nuclear Criticality Safety

  • NCS program development, implementation, and assessments
  • Criticality code verification and validation
  • NCS evaluations of fissile material operations per DOE-STD-3007-2017
  • Criticality incredible (CI) determinations to support deactivation activities
  • Criticality accident alarm system detector placement and shielding analysis
Design
  • Providing complete design, fabrication, and testing services under our NQA-1 Program
  • We perform the final design, fabrication, testing, and delivery of the system in accordance with the requirements of the equipment specification
  • Installation support at the client’s facility
  • Configuration Management and Control
  • Design Analysis Calculations
  • Design Specification Development
  • P&ID; Process Flow Diagrams
  • Process Improvement
Safeguards & Security
  • Security program surveys and assessments
  • Information security and classification
  • Emergency management
  • Security program planning and optimization
  • Protective force planning
  • Document classification and protection